According to locals, the 10 km road, constructed nearly two years ago by the Gurugram Metropolitan Development Authority (GMDA), still remains...
Vous n'êtes pas connecté
Maroc - HINDUSTANTIMES.COM - Gurugram News - 14/Jan 23:02
Locals said that road carpeting work was carried out across the entire sector between April and July last year, but within the next two months, the road surface began to deteriorate.
According to locals, the 10 km road, constructed nearly two years ago by the Gurugram Metropolitan Development Authority (GMDA), still remains...
According to locals, the 10 km road, constructed nearly two years ago by the Gurugram Metropolitan Development Authority (GMDA), still remains...
Source: Pothole patching underway along Seke Road, reconstruction set for February – herald Freeman Razemba Senior Reporter Pothole patching is...
The participants formed a human chain and demanded the development and completion of 24-metre sector roads, connecting various high-rises across all...
Locals cite waterlogging after brief rain, illegal dumping, unsafe pedestrian access and rising commute costs, with authorities promising phased...
Locals cite waterlogging after brief rain, illegal dumping, unsafe pedestrian access and rising commute costs, with authorities promising phased...
Source: Seke Road reconstruction to start from Harare – herald Freeman Razemba-Senior Reporter Reconstruction and widening of the entire 66,5km...
Officials said the authority has been directed to take up construction immediately to ensure smooth and safe movement for residents living near the...
Officials said the authority has been directed to take up construction immediately to ensure smooth and safe movement for residents living near the...
The CM said that several major initiatives would be undertaken in Bihar over the next five years (2025–2030), which happens to be fifth term of the...